Milton Of Drimmie Farm – Blairgowrie

In early 2017 Raeburn Drilling & Geotechnical Ltd were asked to tender for an agricultural private water supply in Balirgowrie, Scotland. With great delight we were awarded the contract and went on to drill a successful 90 meter borehole producing 4,500 litres per hour, which was divined by Doug Bates of Geodivining International.

Following the success of the drilling we installed an energy efficient 3 phase borehole pump mounted in an industrial GRP housing unit (right).

The system now feeds a tank on the hill and the farm never have to worry about water shortage again. We would like to take this oppotunity to thank out clients a Milton Of Drimmie for choosing Raeburn Drilling & Geotechnical Ltd as their trusted drilling contractor.

If you would like more information on private water supplies please contact our team on 01698 711177, we’d be happy to help!

New Drive On Access Rig.

StoryAt the beginning of July we welcomed a new drive-on access rig to our fleet. This will allow us to engage in competitive mobilisation costs throughout the U.K.

 

With over 30 drilling rigs ranging from drive- on access to low ground pressure machines, were sure to have something to meet your requirements.

 

Stay posted for more news as the second one is on the way!

 

 

 

West Newton Farm, Newmilns

Raeburn Drilling were contacted by the owners of West Newton Farm, Newmilns about obtaining a private water supply. It was after the success of the neighbouring farms well that they decided to go ahead with the drilling.

In late 2015 we had a survey carried out by Doug Bates of Geodivining International. From this a successful flow rate of 2000 litres per hour was accomplished.

If you are interested in obtaining a private water supply then please contact our waterwell team on 01698 711177.

Chesterfield Caravan Park

We recently installed a private water supply for Chesterfield Caravan Park, Berwickshire. After being invited to drill by Doug Bates of Geodivining International, a successful well was drilled with a flow rate in excess of 50,000 litres per hour. Pic 2

We are set to comission the borehole around the middle of may & expect to see great results and long term savings for the caravan park.

For more information on private water supplies please contact us on 01698 711177.

James Raeburn

Unthank, Langholm – Borehole 2

Following the success of borehole 1, we then drilled a second borehole accross the road from the farm steading. With Doug Bates of Geodivining involved we were able to acomplish another successful waterwell in excess of 5000 litres per hour.

Both systems have now been installed and are fully functional. Unknown-1

For more information on private water supplies please contact us on 01698 711177.

Unthank, Langholm – Borehole 1

Raeburn Drilling & Geotechnical Ltd were contacted from Doug Bates of Geodivining International regarding the drilling of two boreholes in Langholm early last year.

After Doug had divined a locaton and provided a report, we were able to drill two sucessful waterwells to a total depth of 50 meters each. Two very productive wells with a flow rate in excess of 5,000 litres per hour.

Unknown-1Pictures and a story of borehole two will be available at the end of the week. For more information on obtaining a private water supply please contact us on 01698 711177.

Best Regards,

James Raeburn

Hammerlands Centre. Part 1 – Drilling

Raeburn Drilling & Geotechnical Ltd undertook what was initially a difficult drilling job for the Hammerlands Centre in Moffat.

With over 25 meters of overburden through sands and gravel deposits we were able to use our resources to accomplish a successful cased and grouted borehole to a total depth of 100 meters.

During this we accomplished a flow rate in excess of 4,000 litres per hour.

We are returning now to complete a full pump installation in the forthcoming weeks. Please stay posted for the next feed which will show the complete installation.

 

For more information on private water supplies please contact our team on 01698 711177.

 

James Raeburn

 

South Cairnies, Glenalmond.

In early February 2016, Raeburn Drilling & Geotechnical Ltd were contacted by Doug Bates of Geodivining International regarding the drilling of a new private water supply at South Cairnies, Glenalmond.

Story FeatureWithin a matter of weeks we had accomplished a successful supply of 1000 litres per hour for the new build property.

The average household will use 1500 litres per day therefore what was accomplished was more than adequate.

For more information on obtaining a private water supply please contact us on the telephone number/ email provided.

James Raeburn

 

 

 

Royal Highland Show 2016

We are delighted to annouce that we will be returning to this years Royal Highland Show! For the past two years we have had much success and met some great people along the way.

We will also be doing our yearly ticket giveaway again on our Facebook page. You can find this located at the bottom of the website.

Please stay posted for further details on stand location etc.

 

Best Regards

James Raeburn.